Master Plan for Interim Improvements to the East River Waterfront in Manhattan

News
Planning updates
The Jerry Driscoll plaque along the Jerry Driscoll walk
To effectively execute interim improvements on the East River Waterfront, Battery to Bridges has created a timeline to help prioritize projects in order of priority and feasability.

Short-Term Priorities

These are immediate actions that can improve public access, safety, programming, and waterfront use within approximately one year.


  1. Fund BtoBC interim programming under the FDR Viaduct

    • Provide operating and program funding for BtoBC to activate underused areas beneath the FDR and on Pier 25 and Pier 35 with recreation, cultural events, environmental education, and community programming.

    • Create and maintain ecological zones and habitat restoration both inland and in-water to enhance health of nearby residents, fauna and the aquatic environment.


  2. Designate BtoBC to oversee public programming at Pier 15

    • Authorize BtoBC to coordinate consistent, community-oriented programming that makes full public use of Pier 15 and its upper deck.


  3. Office space to BtoBC at the Pier 15 Pavilion in partnership with Dock NYC

    • Provide BtoBC with an accessible waterfront office and community meeting space from which it can coordinate programming at Piers 35 and 15, partnerships, and public engagement.


  4. Repair the water supply and swings at Pier 35

    • Restore the pier's nonfunctioning water features and swings so that this heavily used public space can operate as originally designed.


  5. Maintain and repair the Jerry Driscoll Walk

    • Undertake immediate repairs, cleaning, lighting improvements, and ongoing maintenance to preserve this important waterfront pedestrian connection.


  6. Reaffirm Public Access Agreement to the Battery Maritime Building (outdoor and indoor spaces)

    • Install clear signage and establish operating procedures confirming that the restrooms and the café within the publicly owned Battery Maritime Building are available to waterfront visitors.


Mid-Term Priorities

These are projects requiring planning, interagency coordination, capital funding, or resolution of existing legal and operational constraints.


  1. Remove all vehicle parking from beneath the FDR Viaduct

    • Relocate government, employee, and commercial parking so that publicly owned waterfront land can be reclaimed for recreation, pedestrian circulation, community uses, and resilient open space. Landscape and green the esplanade and waterfront wherever possible.


  2. Remove or replace the abandoned pier pilings adjacent to Brooklyn Bridge Beach

    • Remove hazardous remnants of the former pier to improve safety, views, shoreline access, and the potential for swimming, boating, and other water-dependent recreation.


  3. Repurpose public open space at Pier 15

    • Return any public space to active public use through landscaping, seating, recreation, and connections to the surrounding waterfront esplanade.

    • Analysis of the structural integrity of the entirety of the public esplanade and create a usage plan to minimize and mitigate further damage and maximize programming and opportunities of the public realm.


  4. Evaluate/enhance the marine habitat around Pier 35


Long-Term Priorities

These are major capital and land-use projects that are essential to creating a continuous, resilient, and publicly accessible East River waterfront.


  1. Relocate the DSNY Manhattan District 3 Garage and FDNY EMS operations away from Pier 36

    • Identify appropriate inland or alternative sites for these municipal facilities so Pier 36 can ultimately be reclaimed for waterfront recreation, community facilities, maritime uses, and resilient open space.


  2. Demolish and Rebuild the New Market Pier Platform

    • Replace the deteriorated pier structure with a resilient, publicly accessible platform capable of supporting indoor recreation, maritime activity, and community programming.

    • Build a badly need Seaport Recreation Center.


  3. A Brooklyn Bridge Beach similar to Gansevoort Peninsula

    • To align with promises made for public access, programming, and improvements to the surrounding CSOs and to the marine habitat.

Around the warterfront

More Recent Updates

An image of the New York Harbor from the New York Times

Aug 16, 2026

It’s a Crowded Place With Some of the City’s Trickiest Traffic

An image of the New York Harbor from the New York Times

Aug 16, 2026

It’s a Crowded Place With Some of the City’s Trickiest Traffic
A map indicating where the Brooklyn Bridge Beach would be constructed

Jun 15, 2015

The Brooklyn Bridge Beach: A Feasibility Study

A map indicating where the Brooklyn Bridge Beach would be constructed

Jun 15, 2015

The Brooklyn Bridge Beach: A Feasibility Study
The area of the former New Market building from the Tribeca Trib

Nov 9, 2022

Push Begins for Community and Sports Center on City-Owned Seaport Site

The area of the former New Market building from the Tribeca Trib

Nov 9, 2022

Push Begins for Community and Sports Center on City-Owned Seaport Site
An image of the New York Harbor from the New York Times

Aug 16, 2026

It’s a Crowded Place With Some of the City’s Trickiest Traffic
A map indicating where the Brooklyn Bridge Beach would be constructed

Jun 15, 2015

The Brooklyn Bridge Beach: A Feasibility Study
The area of the former New Market building from the Tribeca Trib

Nov 9, 2022

Push Begins for Community and Sports Center on City-Owned Seaport Site
A sewer overflow point from City Limits. org

Jul 31, 2026

Opinion: New York Knows It Flooded. The Public Still Can’t See How the Sewer System Performed.
The Brooklyn Bridge viewed from the edge of the water
The missing swings at Pier 35
The Manhattan Bridge
Underneath the FDR drive
The Platinum Transparency award given to Battery to Bridges in 2026

Show Your Support

Your support strengthens the community voice for a waterfront that is public, resilient, recreational, ecological, and accountable. Join us in creating a brighter future for all.

The Brooklyn Bridge viewed from the edge of the water
The missing swings at Pier 35
The Manhattan Bridge
Underneath the FDR drive
The Platinum Transparency award given to Battery to Bridges in 2026

Show Your Support

Your support strengthens the community voice for a waterfront that is public, resilient, recreational, ecological, and accountable. Join us in creating a brighter future for all.

The Brooklyn Bridge viewed from the edge of the water
Underneath the FDR drive
The Platinum Transparency award given to Battery to Bridges in 2026

Show Your Support

Your support strengthens the community voice for a waterfront that is public, resilient, recreational, ecological, and accountable. Join us in creating a brighter future for all.